Specification drafting

Sized before it is built.

The brief is the specification, and it is written before the build. Anything inherited from a source is tested rather than assumed. Each delivery says how old its parts are.

  1. Feasibility counts

    How many records meet your criteria, with the criteria written out so the number can be checked.

  2. Catch-all detection

    Separating addresses that are confirmed from addresses on a domain that accepts anything.

  3. Completeness testing

    Checking which columns are populated and to what degree, before handover rather than after it.